12345

Spannstelle 22/10 5mm zurückliegend

5 mm zurückliegend

Production of anchor points with receded seal.

     

Tensioning of the formwork according to a defined anchor grid. Production of sharp-edged, bleeding and discoloration-free tie points by means of a support cone with a closed-cell 10 mm thick sealing foam ring on the formwork side and a rear sealing foam ring between the spreader and the support cone.
Support cone height = 10 mm. The formwork tie has to be re-tensioned during the concreting process.

Sealing of the tensioning point with a concrete cone 3-5 mm behind, matching the concrete in terms of color and surface. The sealing is carried out after sampling and after approval by the building owner.

The air-side tensioning points are bonded with a one-component, grey adhesive. Bonding of the room-side clamping points (no damp rooms) with a single-component, non-flammable adhesive. Pre-cut fixed lengths are to be used as expansion tubes. Cutting of the expansion pipes by the customer must be avoided.

Product of planning: MARO® expansion joint 22/10 receded.

www.maro.info

MARO® GmbH
Walzwerkstrasse 30
47877 Willich
sales@maro.info

Unit: Piece   Price:

Product data sheet:

MARO-Sleeve Cone 22/10/10 V2

MARO-Concrete Cone 22/05